Projects user interface

  • Updated

Project bar

A project bar is displayed at the bottom of the Optimizely Content Management System (CMS) window, indicating whether a project is active.

The project bar

When you first access the edit view with the projects feature enabled, no project is selected in the project bar. When you select a project, it is preselected the next time you open the user interface.

If a project is active—that is, is selected in the project bar—changes (creating a page or block, updating existing content, uploading an image, and so on) are automatically associated with that project.

If you select the option None (use primary drafts), you can work with content items as usual without associating them with any projects.

You can create, rename, and delete projects from the context menu on the project bar.

Context menu on the project bar

If you delete a project, associated items are not deleted but are no longer associated with a project.

Project overview

You can open an overview from the projects bar that displays content items associated with the active project.

The project overview

The overview shows details such as name, content status, content type, and time and date for the latest change of each content item.

Each content item in the overview has a context menu from which you can set it to Ready to Publish, open it for editing, and remove it from the project, providing you with Edit access rights. The context menu button displays when you hover over an item.

You can select multiple items in the overview and remove them from the project or set them as Ready to Publish simultaneously. Common computer mouse and keyboard functionality for selecting multiple items is supported, except for CTRL+A, which is not supported.

From Options in the overview, you can publish all items set to Ready to publish immediately or schedule them for publishing later.

Show comments open a view where you can select a project item and see a list of events connected to the item. You can add comments on each event and reply to comments, see Collaboration between editors.

Click Sort to order content items for a better overview, and Refresh to reload the view if multiple editors are working on the same project.

Project items navigation panel

The project items navigation panel provides quick access to items in the project. Double-click an item to open it.

The Project Items tab in the navigation pane

Each content item in the project items panel has a context menu displayed when you hover over an item; the menu options are the same as those in the project overview. You can select multiple items in the list as in the project overview.

Versions when you work on projects

Add the versions gadget to your user interface if you are working with multiple drafts and projects to see a list of the different versions.

Only one version of a page is associated with the project. This means you can have a published version of a page and several drafts, and any one of these versions can be associated with the project. If the associated version is published, the project overview displays Published for that item. If it is not the published version, the overview displays Draft, Previously Published, Expired, and so on.

The Versions gadget shows you which project each version is associated with, which is especially useful if you are working with multiple projects for the same content:

Several projects displayed in Versions gadget

You can only have one published version, so if you publish another version of the page (that is, a version that is not associated with the project) after the version associated with the project, the project version is not published anymore and, therefore set as Previously published in the project overview.

When you open an item and have a project active, CMS displays the version associated with the active project. If you open an item and do not have a project active, Optimizely displays the version that is set as primary. You can see which version is the primary in the versions gadget; the primary version is marked with a target symbol Optimizely image. The primary draft is not necessarily the latest version. See also: Set the primary draft.

When the projects feature is enabled, versioning works in the following ways:

Project 'X' is selected Result
and you create content from scratch: The draft is created and added to the active project automatically. Because this is the only version of the content, it is set as the primary draft.
and you update existing content: Is the content a draft and associated with the active project?

Yes – The draft is saved and still associated with the active project. Whichever version was the primary draft before is still the primary draft.

No, the content is a published version or a draft not associated with the active project – A draft is created and is associated with the active project. The previous version is still the primary draft.

If there is a previous draft within the project in the same language, the previous draft is replaced with this draft because only one version can be associated with a project. The previous draft remains in CMS as a draft but is no longer associated with a project. A draft of the same project item but in another language is not replaced as it is viewed as another version of the item. This means you can have one draft in English and one in French on page Z in Project X, but you cannot have two in English on that page.

Flowchart on how drafts are created when using projects

None (use primary drafts) is selected Result
and you create content from scratch: The draft is created and set as the primary draft.
and you update existing content:

Is the content a draft?

It does not matter if the content is associated with a project; versioning works the same.

Yes – The draft is updated and saved. If it was associated with a project before you edited the draft, it will still be associated with it afterward. Whichever version was the primary draft before is still the primary draft.

No, the content is not a draft – A draft is created and is not associated with a project. It is set as the primary draft.  

If the updated content is a media file and auto-publish is turned on, the media is automatically published at this stage.